Global trends impacting project management (part 3)

Ok. Here's the last part.
And yes, I know you got it figured out.

Social

And the project manager asked, "What does this have to do with project management?"

A lot really.


  • Lines between professional and personal become blurred. Project Managers now have to be more aware on the impact of project and project activities to their resources. Project resources are now more keen to be identified with "nice" and "awesome" projects. Involvement in projects become a reflection of the individual who is part of that project. For project managers, there is a need to reinforce the "Why this is such a cool project to be in" card. Even the most simplest project need to be fashioned and sold in a way that it is worth being part of as it reflects a resources' character - It's not just work for him anymore.
  • Projects are done in the light of day. There is no hiding a project. Gone were the days that   projects can be done in secret. It is very difficult nowadays to work on something without others noticing. As project managers, we need to be prepared for public scrutiny at every turn. This adds to the already high level of communication needed by everybody else. Your  stakeholder register now includes everybody with a twitter account. This can either be good or bad, depending on capability as a PM.
  • Availability of resources has increased. Information is now viral. It spreads whether you like it or not. In doing so, your need for resources, both material and human can be met faster - and at times better. 10 years ago, there was no such thing as crowd-sourcing. Now, you can set up a kickstarter fund for almost anything. The advent of viral information has opened doors to projects that have never before been reached or imagined by anyone. The playing field has leveled. The World is Flat according to Thomas Friedman.
  • There is an increase in noise. Project Managers know that noise inhibits productivity. 10 years ago, you wouldn't have problems with resources going (and staying) online for hours on end. These decrease productivity and become wastes of company time. Project Managers now need to put extra measures in ensuring the needed information and only the needed information become processed by the project resources. As they say, too much of a good thing is bad for you... and social media is no exception.
And so there you have it. These are but a few of the Global Trends that have impacted how project managers now manage projects. It may be easy to take these things aside as matters that don't go up the escalation list. Well they shouldn't - as these can be almost always handled by the PM. Not managing these can sometimes be costly.

Tuesday, October 22, 2013

Global trends impacting project management (part 2)

Yes, I know it took awhile for part 2. Then again, its here... Hooray for me.

Mobility

The rise of the Smartphone, the influx of unlidata charges, and the proliferation of mobility tools have largely disrupted the way project management is done now. During the late 90's, the use of the personal computer started to become a must have tool for project management. Reports, spreadsheets, presentations, and our most loved project management tools for project tracking were all in the PC. PM's relied heavily on the PC to do most of their PM work. As the end of the first decade of the 21st century came, the computer left the desk and into the laps of various professionals. It was now easier to create those all important Gantt charts while on the go. Project Managers were now capable of doing work at the job site rather than the office. Location has been less of an issue.

As we are now on the second decade of the 21st century, personal computing is now jumping from the lap into the hand. We are now in the age of the Smartphone - and this is what Project Managers need to remember.

  • Work happens whenever, wherever. - Location is truly not an issue anymore. Whereas in the olden times, people choose to start work, nowadays people choose to be disconnected from work. The default mindset is that you are always capable of doing work (project tasks) unless you so decide not too. There is no such thing as a 9-5 job anymore. This is true even for projects that are on the same timezone. Project Managers are expected to be more responsive in communicating as they have the means to communicate anytime anywhere. While the tolerance level for this may vary from country to country, the general trend is still the same and there is no getting around it.

  • There are a plethora of new tools out there. - Project Tracking on your Smartphone? Of course! The typical PM software and office productivity software are still very much in use nowadays - but these are not your only options. The need to be mobile has brought about new tools for online collaboration, communication, file sharing, video conferencing, and so many other needs that were not present before. Its now just a matter of identifying the most appropriate tools for you to manage your project. I personally use a lot of cloud-based file sharing tools like Dropbox and Google Drive. I also use online collaboration tools like Trello and Teambox. Some swear by Binfire or Basecamp. There are also others that are specific to software development and the list goes on.

  • Your team is just as mobile as you. - Yes, for all you know, they can be programming in Boracay. What this means to you as a Project Manager is that you need to make sure you know how to connect to your resources in a variety of ways. You also need to know what is the best way to connect to your team given their level of mobility. This (the medium of connecting) is the added twist that a Project Manager needs to be conscious about when managing teams. Would a Skype call be better than a group chat for a resource that is in the train? Are your resources capable of reading long excel files in their Blackberry's (yes they still exists) or should you be sending them PDF's instead?

So here are three things that Mobility does to change the way we manage projects. Project Managers nowadays have no option but to adapt to these changes lest they come to a point that their projects become unmanageable. The one big mistake for a PM to make is to assume that these factors do not exist and try to bring things back to ancient times. It just won't work and will only hamper project success because it will go against how people now normally behave.

On my next post, I'll focus on the last Global Trend, Socialization.

Tuesday, July 9, 2013

Global trends impacting project management (part 1)

The profession of project management has been around for decades. Concepts like earned value management were around during the 60's. Project Managers have been talking about the WBS and the "Project Plan" for as long as there are professional project managers. And just like any profession, we need to be cognizant on the trends that impact how we do our profession. Now just like a surgeon getting acquainted with new techniques and advances in performing surgery, we too as project managers need to be aware of things which impact us.

Here's a couple of major movements that occurred in the last decade. Whether we like it or not, this is where the tide is going.

Globalization
Yes, this might not sound so new to you, yet a lot of people tend to forget its impact. Gone were the days that a project is composed of people sitting in the same room or having a chat at the water cooler. Here's a list of what's happening more frequently nowadays:
  • Working hours are more skewed - this is to accommodate overlapping of working hours. Project resources nowadays need to have flexibility of schedule to ensure proper collaboration with resources from a different time-zone. Organizations that still merit employees for clocking in at 9 to 6 might need to revisit their policies as it may be counter-productive to their project.
  • Cultural sensitivity is a must - a long time ago, this was not much of an issue as projects requiring interaction with resources / customers from a different cultural background were few and far between. Nowadays, it is very common to deal with various cultures in a single project. In situations like these, project teams need to be sensitive so as to ensure that there is a smooth working relationship between project resources of various cultures. Resources need to be aware of cultural norms, habits, communication styles, and even idioms and figures of speech used by the other cultures. Remember that no culture is superior to the other. We cannot and should not force (or assume) that Asians should act like Westerners or vise-versa.
  • Price sensitivity is higher - The globalization of projects have been directly driven by the need for more cost-effective solutions. The spur of growth in the outsourcing business (or right-sourcing business - call it what you want!) is a clear indication that business are more keen in ensuring they get the biggest bang-for-buck, especially in their non-revenue generating projects. And just like what we've learned regarding the triple constraint, there is a need to look at the other factors in a project that will be impacted  such as schedule, quality, risk, and scope among others. We cannot expect that the project can be delivered in the same amount of time if it were done in Delhi than in Delaware.
Next post, we'll discuss about Mobility.

Friday, November 9, 2012

The search for Professional Maturity

Also known as the x-factor come hiring, performance evaluation, and pretty much everything that requires an assessment of a resource or potential resource.

Professional Maturity is the attribute of a resource to handle various types of business and professional situations in a virtuous, dignified, and responsible manner. Although I think this is just a very broad stroked definition - it's definitely more than this. It manifests itself clearly in situations like a customer is being difficult, or your management requires you to do something above and beyond your workload, or even being able to handle unfortunate circumstances. Professional Maturity brings out the best in a person during clutch moments.

Management loves people who are Professionally Mature. Then again, where are these people and how to I get them? How do I recognize them? The unfortunate part is that it is not easy to spot one since they only shine when there are extraneous situations. I'd like to help out in this search by pointing out some key concepts on what Professional Maturity is and what it is not.
  • Professional Maturity is not relative to age. - Not because you are older does it mean you are more professionally mature. Of course there is a tendency for older people to be more professional mature than younger people due to the amount of time they were exposed to the corporate world; but that should not be taken as such. Actually, the best people to have are those that are professionally mature but are quite young. You get more mileage.
  • Professional Maturity is not relative to seniority - Not because you've been in the organization longer does it mean that you are more mature. It just means you've been there longer and probably have a better retirement package.
  • Professional Maturity is not relative to position. - Not because you are the big boss means that you are Professionally Mature. However, I do want to note that most of the people that do get promoted are those that exhibit professional maturity. The only sad part is that not all are.
  • Professional Maturity is about exhibiting grace under pressure. - Instances like having to meet super tight deadlines, being reprimanded, or being handed down difficult situations, and not being dazed or rattled are signs that a person is professionally mature.
  • Professional Maturity is being able to take the good with the bad. - Because you know that it won't always be sunny skies and clear weather. A person that is professionally mature is cognizant of this and will not be shaken when bad news comes in. He knows that the world is not perfect and will adjust when needed.
  • Professional Maturity is being able to make decisions in the best interest of the organization. - This means being able to make the tough calls - like letting people go or even accepting that you have to leave the organization. He is a person that can the organization can lean and count on.
  • Professional Maturity is being responsible and accountable for his decisions and that of his subordinates - Not only does he make tough calls, he also stands by them. A professionally mature person will accept the repercussions of his decisions and that of his team.
  • and a lot more...
It may seem that Professional Maturity is a mixture of various attributes of a person, and that it because it is. Its a mixture of 11 (or more) secret herbs and spices as the colonel would say. It is my hope that Project Managers look for these in their resources, as these will definitely improve their chances of having more successful projects. Yes, its not easy to find them - and that is why they are very valuable to have.

Wednesday, June 15, 2011

So what are you paid for?

A couple of years ago, a software developer of mine asked me why aren't people who get to do harder work get paid more? His argument was that people like construction workers, miners, and those doing dirty jobs should be paid a premium primarily because their job was tougher and more labor intensive. This got me thinking really hard to come up with an answer because to a certain degree, his argument was logical.

Given the fact that my wife, who's a domestic diva, complains about the household chores and doesn't get paid for it, makes the argument more pressing.

If you take a look at the common stereotype we have for top executives, playing golf as part of "business", attending social events, and even having huge corner offices with nothing but papers on their desks to sign (whereas coders and testers have half-a-cube filled w/ source code print-outs, test reports, and user manuals) - we can but only think that this does not seem right. If you work more, you should get paid more, right?

WRONG.

So what are you paid for?

The short and simple truth is that people are paid based on their ability to think and decide. That's it. Period.

Ok. Step back a bit and look at each job you can think of and the level of thinking and decision making involved for each job and relate that to how much each job is being paid. Of course there will be variances here and there, including nuances such as hazard conditions and market demands, but the general trend is towards the notion that the more you think and decide in your job, the better is your paycheck.

This is why software developers are paid higher than construction workers. This is why a doctor is paid more than a nursing aide. This is why people who do menial tasks, such as washing dishes at the local fast-food pays significantly less than a heart-surgeon doing a triple by-pass surgery. This is why you are most likely paid less than your pointy haired boss.

On the bright side of things, Now that you are aware of this general truth - take it to yourself to accept more levels of responsibility from your company. Do not be afraid to make the call. Show management that you can think and decide - and the moolah will come.

Friday, April 22, 2011

On Negotiating


My professor once asked, "Who makes the best negotiators in the world?" The whole class was dumbfounded. "Someone that can influence you to agree on something without you losing trust and respect on the other person. Someone that takes your best interest at hand, but at the end of the day, she gets what she wants." No one in a class of twenty-somethings and thirty-somethings knew the answer.

"It's your mothers." said my professor with a smirk on his face. Then it all hit us like a brick on a wall. This man was correct.

Negotiating is an art. Let no one tell you otherwise. A lot of project managers fail at being project managers because they lack the ability to negotiate. What could have been a simple trade of needs ends up in a stalemate simply because project managers cannot get what they want out of the other party. This could be with the customer, stakeholder, staff, suppliers, etc. It is ironic to think though, that negotiating is one of the key activities we do each day as an individual. We negotiate when we do shopping... We negotiatie when we order food... We negotiate with our work mates... heck we even negotiate the roads when we travel.

While it would be fun to write all that I know about negotiation, the truth is that its such a broad topic and the only time I really appreciated it was when I actually started using everything that I learned about negotiation. (I give credit btw to Mr. Joey Estreta, my professor who gave us the opportunity to practice negotiation in his class).

Nonetheless, here are the top three things you should always remember about Negotiating.

1. Know your Interest.
Interest is the "why" of negotiating. Before sitting at the negotiating table, ask yourself..."why am i doing this?" Interest is the ulitimate goal behind the negotiation. It is the need that has to be met. Interest is different from Position. Position is the "what" of the negotiation. Position is that which you are requesting from the other party to satisfy your interests. Telling your dad, "I want a car" is a position. Chances are, you'ld get a resounding "No" in record speed. But what is the real reason why you are asking for a car? Is it because you are having trouble going home late? Is it because you want to impress the girls in school? Is it because your allowance ain't enough for the ride home? Anyone of these reasons could be your Interest. And if you look real hard, you'll notice that there are several ways to go about finding the win-win situation. Knowing your Interest opens up several possible positive avenues of resolution. A position is typically just one of those avenues. Your dad can probably lend you his car on date-nights, or he can just increase your allowance, or you can ask your professor for a change in schedule so that you don't need to go home late.

2. Know the other party's Interest
It is equally important to understand the other party's interest as much as yours. This gives you more ways to satisfy their needs without necessarily putting you on a disadvantage. A lot of people managers fail badly on this area. I know of a scenario (actually a lot of scenarios) wherein an employee left the company and the manager simply failed to realize the interest of the employee. He was a pretty good employee, his skill was rare within his organization, and he has served the company for a good number of years. The manager kept insisting that he cannot give him a pay raise for various reasons hence the employee decided to go. Yet, what the manager failed to realise what that a pay increase was only the position that the employee was taking. The real interest was the fact that he wanted to be recognized for his efforts in the company. He was highly utilized, yet his accomplishments did not seem to pay off anywhere. Money was only secondary. Having a pay increase was only a manifestation of his need for recognition.

3. Know your BATNA
No this is not Robin's man-friend. BATNA stands for Best Alternative To a Negotiated Agreement. To put it simply, if the negotiation does not push thru as planned, what is my other alternative? A big risk during negotiation is that we settle for something less than what we want or expect. This is not necessarily a bad thing because this could in fact be the best available settlement for both parties. But sometimes we settle less than what we could have elsewhere. Knowing your BATNA increases your ability to negotiate since it makes you aware of your alternatives. Remember: There is always a BATNA. At its very least, your BATNA is your ability to walk away from the negotiation. A good example of BATNA is if you are negotiating with a prospective employer on a job offer. Your BATNA is your other existing offers (if there are any) or just staying with your current employer. You need to constantly measure what is on the table with your BATNA. If the offer is less favorable than your BATNA, then why proceed? Sometimes too, it is good to inform the other party of your BATNA. It makes them aware of your Least Acceptable Result (LAR).

These are the three most important things to know during a negotiation. But knowing this is just the first step. Being able to master the various negotiating techniques and formulating a negotiating strategy is also crucial in achieving a win-win agreement.

This is a nice link on the various negotiation techniques out there (http://changingminds.org/disciplines/negotiation/tactics/tactics.htm). Remember, it takes practice before one becomes proficient in the art of negotitation.

Friday, January 30, 2009

I am replaceable

It sometimes grips us with fear to hear that we as employees are actually replaceable. Oftentimes we try to do our job to the best of our abilities to a achieve a point in time that people will start thinking... "What will i do without him/her?" You know, people often think that being irreplaceable ensures job security.

Well... yes and no.

If someone is irreplaceable, he is also unpromoteable. This is why some good technical people remain well... good technical people. The tendency for management is to place people where they can be most effective. Irreplaceability is a sign of inflexibility. If management cannot move you around because you're the only person that can do the job... then chances are you're stuck there for life (or until the role/post becomes unnecessary).

The first thing someone should do once he gets assigned to a position is to find his replacement. This is otherwise known as "succession planning". If you've read one of john maxwell's books (21 laws of leadership methinks) you'll read about the "law of explosive growth / law of reproduction" which pretty much states that good leaders are capable of multiplying themselves - empowering their teams to do what they they can do. These are all in-line with ensuring proper succession planning. Managers who are capable of sharing knowledge and workload to his/her subordinates are more likely to be able to accomplish more and hence improve the overall performance of the team. On the other hand, managers who keep everything to themselves are bound to fail because he/she is overburdened with work since no one in his team can help/assist him.

-----------------------------------------------------------------------
Currently, I've asked my boss to move me in another role in the office. Although its much much smaller in scope - it's something that I've been itching to do for some time. In doing so, I had to be replaced by people from my team. I guess I'm just glad to see that the team is still functioning well and in order. I do not expect my lieutenants to manage the same way as me, but because they know what I do and what needs to be done - they get the job done.

Tuesday, October 14, 2008

Carrot Sticks

This ain't about food.
This has more to do with motivating our employees & resources to achieve project goals. Oftentimes, managers choose between a carrot (providing rewards and incentives) and a stick (providing penalties) to ensure project success. Some managers often have a preferences depending on their very own nature. They normally tend to go with what they themselves see as their very own motivating factor. In reality, both carrots and sticks are needed, although in most situations, a carrot is more appropriate. Sticks are used when situations call for more drastic measures and the opportunity to reach for the carrot becomes futile.
It is quite unfortunate for me (and more unfortunate for my teams) that I am now required to pull out my stick. I'm still hoping for the best though but am constantly preparing for the worst.

Friday, September 26, 2008

Playing Favorites

This might just well be the most debatable topic I will have ever written. Is it good to play favorites in the office (or project team)?

Honestly, I would say YES. But before anyone starts firing back at me for being such a biased boss, let me explain myself further.

As human beings, we are setup to like and dislike things, people, situations, and sorts of whatever. We cannot help it. We are naturally inclined to be biased on anything. The same goes with people we work with. People we normally like normally get the better of us. Hence, it just goes to show that a person I like working with is naturally my favorite.

The whole concept of favoritism however, should not be mixed with unfair work practices. As a manager, it is your obligation to provide equal opportunity to all your employees. Each of your employees should be given avenues to grow their careers and develop professionally. The operative term there is opportunity. It is up to your employees to perform, and their performance should be recognizd properly. If let's say I have two guys, one I like more than the other, yet the other one performs better, I cannot withhold any credit or accolade to him in favor of that which i like more. However, with performance being equal, I would naturally be swayed to the guy I like more. There is a thin line that separates favoritism from unfairness and this should never be crossed.

You might then ask, do i have my favorites? Yes of course. I consider my favorite as my protege. Not necessarily the person that will succeed me later on (that's based on performance), but the person that I will pass on my skills, knowledge, and my realm of influence. Why? Because I like my protege... and no one can contest that.

Wednesday, August 27, 2008

The Manager's Credo

I've learned this saying by Mary Ann Allison several years ago and it has proved to be very useful in remembering the end to end of being a manager. I used to post this in front of my cubicle hoping that my boss would be swayed into thinking about it more intensely.

To me, this is my Manager's Credo.

"Hire the best. Pay them fairly. Communicate frequently. Provide challenges and rewards. Believe in them. Get out of their way and they will knock your socks off."
— Mary Ann Allison

I'll probably try to explain this in the future (or if someone persistently asks me to).

Thursday, June 12, 2008

Managing your Manager

Ok. so this is not really about project management, but it is quite useful for project managers to know and use as they go about managing their projects. Oftentimes, Project Managers get heat from all angles in the organization that they just don't know how to handle each one. Well one of those angles comes from the big boys on top of you namely your managers. I'd like to focus this post on these bunch of guys specifically. I'll probably talk about the others in some succeeding posts.





Ok. So where do we begin?





We begin by going back to what each Project Manager should have always been doing in the first place.






1. Manage Expectations.


One has to remember that your managers (i.e. management) are also stakeholders in your project, and thus are concerned at the outcome of your project (and your work). At the start of any project, they will already have a pre-conceived idea on what you should be doing and what should be the outcome of all these. I've tried to list down some very practical action items that you should be doing as a project manager managing your managers.



Know what they want from you - fairly simple, yet unusually hard to comprehend. Oftentimes the vantage point of management is so different from that of the Project Manager. They see a bigger picture whereas you see the specific project(s) you are handling. Ask yourself what is it that they expect from me? At times, these things will conflict from what you were tasked to do - but there's often a reason for that, and it stems from the fact that they see things differently. A good example would be how your boss tells you to satisfy the customer at great lengths although this at times conflicts with the cost controls you are putting in the project to keep it within budget and schedule. Then again, the reason for management in doing that is that they are cooking up a bigger deal with that same customer which dwarfs whatever project you are working on right now. From that angle - it all makes sense.



Know how they want it served - Knowing what they want is just the first part, being able to understand the how is the second. This deals with how you will respond to whatever it is that they want from you. Should you come off as one who just follows orders or one who engages in discussion are thing that you should be aware of. If your manager is authoritarian, then it definitely won't go well with you being subversive. If your manager tends to delegate, then make sure you are willing to be one who accepts additional work.



Know how to package your deliverables - Ok, so now you know what he likes and how he wants it. Now its time to package your deliverables. This involves being able to present your message (or your work) in a manner that would please him. This involves going back to how he likes things and ensuring that what you deliver is what he is expecting. The wrapping should suit the receipient and not the contents of the package itself. This is because not all the packages you give contain good stuff. This is not an attempt to twist the message or the work output in anyway. This is more of ensuring that any message or work output is correctly received and acknowledged by your manager.


For example:



I have a boss that expects me to do all the work. He just sits there and dreams about our mission statement all day. One day, I need to tell him that our project is delayed due to whatever reason. When I go to him, I won't come knocking saying "Boss I need your help." I go there and tell him "Boss, we're delayed due to xxx. However I've already done yyy to get us back on track." It would initially seem that the second action was always the best course of action, but it was only so because the boss was the typical you do all the work and just update me on the status stereotype. There are others who would've preferred the first one, especially if the boss was very hands-on and wants to be involved in the details all the time.



2. Make them feel that they are the boss.

Oh you should soooo not forget this. At times in our attempt to persuade our managers, it can get to a point that we forget that we work for them and that they have authority over us and how we should do things. The steps to make them feel that they are the boss involves the following:


Influence them appropriately - as I've mentioned in previous posts, influence is a key characteristic of project managers. What better use of that than on your very own manager. This involves making suggestions and recommendations that would suit your requirements.



Let them make the decisions you want - this is a result of proper influence. Guide them on decisions that would benefit you. This is not saying that you need to lie, coerce, or misrepresent -that's plain wrong. What you should do is give your managers options and choices, hilighting on the those that you would consider. Let them know that those choices benefit them as well. After all, if it benefits you - it should benefit them too, right?


Raise them up - As an old saying goes, "Praise and Praise often." Thanking your boss on a job well done goes a long long way. Give them the credit for your achievements. It might sound like crap but once your boss thinks that you think highly of him, he will at some point think highly of you as well (whether he likes it or not). You can probably call it "Good Vibes" on your part.

Well then... those are some of the ways for you to manage your manager. There's still plenty out there. I suggest trying these out and seeing how these things go.

Saturday, October 6, 2007

PLINC: General Management skills for the Project Manager

[reposted from my old yahoo 360 12/14/05]

Trust me, this stuff works!

The discipline of project management is essentially a specialized form of General Management. with this in mind, I believe that it can be said that to be a project manager, you have to have some skills that are present in General Managers. But exactly what GM skills are needed? Read on to see what should be taken from the General Managers aresenal of skills.

Problem Solving. Essential to any project manager is the ability to solve problems effectively and efficiently. This is actually easier said that done, especially in the Project Management world since there is a lot more problems to be encountered per day on a project than managing the daily operations of a business or operations. Why? This is due to the fact that projects involve change, and that change involves risks, and that risks produce issues, and that issues are problems that need solving. If i were in the infantry, this would be my grenade.

Leadership. 'nuff said. The most basic of tools for Project Managers. This is your all-purpose standard army issued bayonet knife. Excellent for opening up a can (of whoopass), cutting thru (personal de)fences, and encouraging people to follow your lead.

Influencing Others. The ability to influence others is the most potent weapon of the Project Manager. Far harder to master than a Jedi Mind Trick, it is seen used only by the most experienced Project Managers. This is a mixture of charisma, diplomacy, and guile rolled into one. Perfect for tight deadlines and uncooperative functional departments. This is a special weapon only used by specialists in the army.
Don't think that influencing others is a bad trait. This is perfectly ok - as long as you're not bribing or getting into conflicts of interest.

Negotiation. Almost every activity in Project Management involves some form of negotiation. From stakeholders to vendors, Project Managers negotiate for time, resources, costs, and deliverables. The better you are at negotitating, the more capable the project manager will be in turning the project into a success. This is the AK-47 of project managers.

Communication. What's a project manager worth if he cannot communicate? Each Project Manager is expected to have a communication skill level particularly higher than the average techie guy. As Project Manager, you are the heart of all the communications that revolve within the project. This is your basic side-arm. You simply cannot be called a Project Manager if you cannot communicate. To see if you at least have the communication skills... ask yourself this question - Was there ever a time in my project that something happened that you were not informed about? An added feature or a forgotten requirement? If the answer is yes - then you have a problem.
---------------------------------------
Well, there's actually more to this than what i stated above. Then again, just focus on the PLINC and you've got a good majority of things covered.